Skip to content
Chargepros

Permits and inspections

EV charger and electrical permits: done fast, done right, done for you.

Our own engineers, permit runners and inspections team handle every step: plans, filing, follow-up, inspections and corrections. Faster and easier than doing it yourself, at a fair price, even after a citation.
  • In-house engineers
  • Permit runners
  • Inspections team
  • After-the-fact permits
Rough-in wiring in a junction box on a block wall, with a level on the box
Rough-in, ready for inspection

Our permit team

Three teams, one goal: approved.

Chargepros electrician planning a conduit route across a garage wall, with ladders set up

Engineers

Load calculations, one-line and riser diagrams, and signed and sealed plans when a job needs them. Complete the first time, so plans aren’t sent back.

Panel directory with an EV CHARGER label added beside the circuit list

Permit runners

We file in person or online the same day, answer the reviewer’s questions and track your permit every day until it’s issued.

An outdoor disconnect switch labeled DISCONNECT EV CHARGER, fed by gray conduit

Inspections team

We book the first open inspection, meet the inspector, and fix any notes within days, not weeks.

Timeline and cost

How long will your permit take?

Your numbers

With our team, typically

1–5 business days

Going it alone, typically

5–15 business days

City permit fees, typically

$150–$500

What the city will want

A load calculation and a one-line diagram.

Typical ranges for a single-family home in the areas we serve; every building department is different, and we confirm your timeline and fees when we file. Fees are the city’s; our permit package for a charger is $350–$500 with the fee included.

Florida law is on your side

Faster reviews and inspections are allowed.

5 business days

For a city to act on single-trade plans for a house reviewed by a private provider, or the plans are approved by law (s. 553.791, F.S., as amended in 2025).

10 business days

For plans signed and sealed by an engineer or architect, with an affidavit, before the city must issue or give written notice (HB 267, 2024).

Virtual inspections

Inspections, including single-trade ones, may be done in person or virtually (HB 683, 2025).

Lower fees

Cities must reduce permit fees when a private provider does the plan review or inspections.

Sources: Florida Association of Counties, private providers (2025); Florida Senate, SB 684 (2024).

Why permit

A permit protects you, not just the city.

With a permit

  • An independent inspector checks the work
  • Insurance claims go smoothly
  • A clean sale: nothing to disclose or fix
  • Utility credits: Duke’s Charger Prep Credit needs a final permit
  • Manufacturer warranties stay valid

Without one

  • Fines and after-the-fact fees, often double
  • Walls or conduit opened for inspection later
  • Insurers can deny fire or damage claims
  • Buyers’ inspectors and appraisers flag it
  • No one checks wire size, breakers or grounding

What we handle

Permits from A to Z.

New installations

Every install we do is permitted and inspected where required.

Panels, batteries and generators

Engineered plans, utility coordination and inspections.

After-the-fact permits

For chargers installed without one, including code corrections.

Failed inspections

We fix the inspector’s notes and schedule the re-inspection.

HOA and condo approvals

Drawings, insurance certificates and board letters.

Commercial permits

Sealed plans, site and load studies for properties and fleets.

Cited or failed?

How we fix a permit problem.

  1. 1

    Send us what you have

    The citation or the inspector’s notes, and photos of the charger and the panel.

  2. 2

    We inspect

    We check wire size, the breaker, grounding, the disconnect and labeling.

  3. 3

    We correct

    Anything not to code is fixed, with a clear price first.

  4. 4

    We file

    An after-the-fact permit or a re-inspection request, the same week.

  5. 5

    We pass

    We meet the inspector and send you the final approval.

In the field

What inspectors look for.

Rough-in wiring in a junction box on a block wall, with a level on the box
Rough-in, ready for inspection
A 40-amp two-pole breaker labeled EV CHARGER in a home electrical panel
A dedicated, labeled EV breaker
An outdoor disconnect switch labeled DISCONNECT EV CHARGER, fed by gray conduit
A labeled EV disconnect
Panel directory with an EV CHARGER label added beside the circuit list
Every circuit labeled
A trench dug across a front lawn for an underground conduit run to a charger
Trenching for an underground run
Chargepros electrician planning a conduit route across a garage wall, with ladders set up
Planning the route

Questions

Permit questions.

Do I need a permit for an EV charger in Florida?

In most cities, yes: a new 240-volt circuit needs an electrical permit and inspection. Our permit package runs $350–$500 where required, with the city’s fee included.

How do you get permits faster?

Our engineers prepare complete load calculations and drawings, so plans aren’t sent back. Our permit runners file in person or online the same day and track the file daily, and our inspections team books the first slot and is there for it. Florida law also lets a private provider review single-trade plans for a house, which the city must act on within 5 business days.

I was cited for a charger without a permit. What now?

We inspect the installation, correct anything that isn’t to code, file an after-the-fact permit and meet the inspector, even if someone else installed it.

What if my inspection failed?

Send us the inspector’s notes. We fix what’s needed and schedule the re-inspection, usually within days.

What happens if I skip the permit?

Fines and after-the-fact fees (often double), insurance claims that can be denied, problems when you sell, no utility credits, and nobody independent checking that the work is safe.

Do you handle HOA and condo approvals too?

Yes. We prepare the drawings, insurance certificates and letters your association asks for.

Tell us what you need.

A new permit, a rush, a citation or failed inspection: send the details and photos and we’ll take it from there.

Get my price Call