Guide
What it costs to install an EV charger in Florida
Most Florida homes pay about $1,300–$2,700 all in for a Level 2 charger in the garage: the charger, the installation and the permit. Here’s what moves the number, and how to see your exact price.
By Ray Payano and the Chargepros team, 10,000+ installs, Florida certified electrical contractor EC13016766. Updated November 2026.
The short answer
Three things make up a home charger price: the installation, the charger and the permit. For most garages that comes to about $1,300–$2,700, after $100 off your installation when you book online.
Example quote: Tesla Wall Connector in a South Florida garage
- Tesla Wall ConnectorYou save $16 vs MSRP
$585$569 - InstallationPanel within 10 feet of the charger$650
- Permit, inspection and load calculationIf your city requires it$500
- Online booking discount−$100
- Permit discount−$50
Or about $72/month with Wisetack financing (24 months at 9.9% APR, subject to approval).
An example only: your quote depends on your home, your charger and your city. Utility rebates, like Duke Energy’s, are paid to you separately, and we help you apply. Permits run $350–$500 where required.
Typical ranges
| Your setup | Typical all-in range |
|---|---|
| Garage, panel close to the charger | $1,300–$2,000 |
| Longer run, outside wall or attic | $1,800–$2,600 |
| Long runs, trenching or a panel upgrade | $2,600 and up |
What changes the price
- Distance and route from your panel to the charger: inside the garage, through an attic, along an outside wall or underground.
- Your panel: room for a new 240-volt circuit, or a smaller circuit, power sharing or an upgrade. See panel and power upgrades.
- The charger: we sell them below MSRP, or you can supply your own. See chargers we install.
- The permit: $350–$500 where required. It covers ahj application and permit fees; electrical load calculation and service review; electrical drawings, site plan and one-line diagram when required.
- Multi-unit buildings, where the building’s rules and power come first. See condo charging law.
Ways to save
- $100 off your installation when you book online.
- Utility programs: FPL EVolution, Duke Energy’s Charger Prep Credit and city utility rebates.
- Financing through Wisetack, for example 24 months at 9.9% APR, subject to approval.
Comparing quotes? Make sure each includes the same scope: how to compare EV charger installation quotes.
Questions
Quick answers.
Why does distance from the panel matter so much?
Longer runs need more wire, conduit and labor, and sometimes routing through an attic or outside wall.
Are utility credits subtracted from the price?
No. Utility credits and rebates are paid to you by the utility after installation. We help you gather the paid invoice and permit they ask for.
Can we help?
See your own price in about three minutes, with $100 off your installation when you book online.
