Panel and power upgrades
Will your panel handle an EV charger? Find out in a minute.

By the numbers
What decides if a charger fits.
80%
Of the service: the most we design a home to use, with the charger
Our design rule, with NEC load calculations
~30 mi
Of range an hour from a 40-amp circuit, plenty overnight
40 A × 240 V × about 3.3 miles per kWh
1 day
For most panel swaps, with power off about 4–8 hours
Our installs
2020
NEC in force in Florida: surge protection required on new and upgraded services
Florida Building Code, 8th edition (2023)
Load calculator
Will a charger fit on your panel?
An estimate by the National Electrical Code’s optional method for homes (NEC 220.82). Our electrician confirms it on site or with 12 months of your actual usage (NEC 220.87), which often shows more room than the formula.
Your options and our prices
Five ways to make it fit, cheapest first.
| Option | Our price | What it does | Best when |
|---|---|---|---|
| Right-size the circuit | Included | A 32- or 40-amp circuit instead of 48 | You drive under 60 miles a day |
| Load manager | $1,200 | Slows the charger when the house is busy | The panel is tight but the service is sound |
| Subpanel | $1,500 | More breaker spaces, closer to the garage | The panel is full, not overloaded |
| 200-amp panel | $3,200 | A new panel with room for the charger and more | The panel is old, full, recalled or corroded |
| Service upgrade | $4,800 | New panel, meter base and service entrance with the utility | The home needs more than its service can carry |
Prices include the permit package and utility coordination; your quote confirms them after a photo or site check.
Signs it’s time
When a panel needs more than a new breaker.
Breakers that trip
Often, and when big appliances run together.
A full panel
No open spaces, or tandem breakers squeezed in.
Known problem brands
Federal Pacific Stab-Lok, Zinsco and some Challenger panels: many insurers won’t cover them.
Rust or heat marks
Florida’s salt air corrodes outdoor panels and meter bases.
100 amps or fuses
Common in older Florida homes, and tight for an EV, a heat pump and a pool.
Big plans ahead
A second EV, a battery, a heat pump water heater: plan the panel once.
Why upgrade
What a right-sized panel gives you.
Benefits
- Full-speed charging, every night
- Room for a second EV, a battery or a heat pump
- Easier insurance and a smoother sale
- Every circuit labeled, with surge protection
- Fewer tripped breakers and hot spots
Risks of skipping it
- Overloaded wiring and breakers that run hot
- Charging that stops when the A/C kicks on
- Insurance problems with known-problem panels
- Failed inspections and utility program denials
- Opening the walls twice when you add more later
How it works
A panel upgrade, step by step.
- 1
Load calculation
From your panel photo and home details, confirmed on site.
- 2
Design and permit
Our engineers size it; our permit team files it.
- 3
Utility scheduling
We book the disconnect and reconnect with FPL, Duke or your city utility.
- 4
Install day
Power off about 4–8 hours. Every circuit moved, labeled and tested.
- 5
Inspection
We meet the inspector and the utility restores power.
Our work
Panels, done neatly.








Questions
Panel and power questions.
Will a charger work on my 100-amp panel?
Often, yes. A load calculation compares what your home already uses with what the charger adds. A smaller circuit or a load manager can keep you on 100 amps; some homes do need an upgrade.
How do I know if I need a panel upgrade?
The load calculation tells us. Older or full panels, fuses, panels with known problems (Federal Pacific Stab-Lok, Zinsco, some Challenger) and corrosion are common reasons to upgrade.
What does a panel upgrade cost?
With us, a 200-amp panel is about $3,200, a service upgrade with a new meter base about $4,800, a subpanel about $1,500 and a load manager about $1,200, with the permit and utility coordination.
How long is the power off?
Usually 4 to 8 hours on the day of the swap. Service upgrades depend on the utility’s disconnect and reconnect, which we schedule.
Who coordinates with the utility?
We do. Service upgrades need the utility to disconnect and reconnect power; we schedule it and pull the permit.
Do I need a surge protector?
Florida’s current code (the 2020 National Electrical Code) requires surge protection when a home’s service is replaced or upgraded, and it protects the charger, the air handler and everything else.
Find out if your panel has room.
The quote tool asks about your panel and flags when an electrician should check it.
